It looks to me that the pillar was poured in place (notice the rectangular pattern on the concrete) but either a void formed (inadequate vibration during the pour) or the concrete didn't cure enough or properly (maybe poured during winter). I don't think any structural engineer would use concrete pipe in this application. The pipe and rubble simply wouldn't have the required strength.
Eh, It will buff out.
ReplyDeleteChina?
ReplyDeleteLetting the belt out after Christmas dinner . . . .
ReplyDeleteOhhhh, spalling like that is NOT good!
ReplyDeleteIt looks to me that the pillar was poured in place (notice the rectangular pattern on the concrete) but either a void formed (inadequate vibration during the pour) or the concrete didn't cure enough or properly (maybe poured during winter). I don't think any structural engineer would use concrete pipe in this application. The pipe and rubble simply wouldn't have the required strength.